Jeremy Vine replaced by Million Pound home rerun after power outage

Jeremy Vine has been compelled off air on Channel 5 after a “important” energy outage at ITN Productions.

The every day discuss present was changed with re-runs of Million Pound House after energy and the back-up generator reportedly failed early on Monday.

Workers at ITN Productions acquired an e mail at 8.30am which mentioned there had been “important energy outage” on the constructing in Grey’s Inn Street in central London.

An replace at 9am mentioned in the event that they had been working from house they “gained’t be capable of entry sure issues”.

PA

Workers camped within the constructing’s lobby as they waited for the problem to be resolved.

On Twitter, Vine mentioned: “Sorry to say, we didn’t make it to air at the moment.

“Questions might be requested of the emergency generator, and the emergency backup generator.

“However good to get some high quality catch-up time with my esteemed co-presenter @StormHuntley.”

Earlier within the morning, a hopeful Vine mentioned: “Energy reduce @ITNProductions so we're all in reception.

“Right here’s hoping @JeremyVineOn5 is with you at 0915.”

Channel 4 Information and ITV Information had been each up and operating for his or her lunchtime bulletins, whereas ITV Meridian has lined the ITV London bulletins, ITN mentioned.

In an announcement, ITN added: “An influence outage this morning has affected a lot of buildings and companies within the Grey’s Inn Street space.

“We have now due to this fact moved to our backup protocols to guard our information output, which has continued to air at the moment.”

Post a Comment

Previous Post Next Post